how much of your lot does the street plan take

austin's street plan sets a width for every street. where a street is narrower today, a lot that redevelops can be asked to give the city a strip along its front. pick a neighborhood, then click a lot, or type an address, to see that strip.

scenario

city neighborhood planning area
every lot, as if each one redeveloped
type a street address, then pick it from the list

the lot you clicked

click a lot on the map, or find one by address, to see its streets, the widths and the strip drawn on the lot.

neighborhood totals

hyde park, private lots(a) full width(b) triggering lots only

neighborhood by neighborhood

planning areaprivate lots(a) share of private land taken(b) share taken(a) lots losing over 10%(b) lots losing over 10%

the cap and the relief

the cap. the city may require dedication only in an amount roughly proportionate to the development (ldc 25-6-23 and 25-6-55(a)), set in a written determination by the director before the application is approved, and it may take a lesser amount. the full-width strip on this page is the ceiling the table describes, not the amount a given project would owe.

the relief. the director may grant a variance from dedication where it would place an undue hardship on the owner or leave the property unsuitable for an economically feasible use (ldc 25-6-86). an owner with 15 percent or more of a lot under a right-of-way reservation can ask for a waiver (ldc 25-6-81(b)). in some cases the city may accept a public access easement over the strip rather than a deed to it, which keeps the land in the lot; that is negotiated case by case, and no code section is cited here for it.

what triggers it. the dedication article applies to zoning or rezoning, preliminary plan or final plat, and site plan applications (ldc 25-6-21). four or fewer homes on a legal lot need no site plan (ldc 25-5-2(b)(1)), so building them on an existing lot goes through a building permit and does not trigger dedication; splitting the lot (a plat) does. scenario (b) follows that line by zoning: it leaves out sf-1, sf-2, sf-3, sf-4a and sf-5 lots and counts every multifamily, office, commercial, sf-6 and pud lot. every street segment counted on this page also carries the table's remark that its required right-of-way does not apply to single-family home properties.

method

sources

the other half of the question. this page shows what a lot could give up. what the same lot can now hold is how many homes fit on this lot now: run the lot there with the front of the lot moved back by the strip shown here.