Residences at Rubi
101 units under Affordability Unlocked. During bidding the developer moved the building from wood to cold-formed steel- after permit. I revised the specifications, details and drawings in two weeks.
Design · Permitting · CADetail is a decision about how two things meet. I like being there when they do.
Drawing custom houses, then out on the site almost every day- the one they called when something architectural had to be solved in place.
Historic remodels, construction documents, and construction administration on landmark houses. Then running the build as construction manager as well as designing it.
Five-over-one podium, prefabricated modular, a hundred-acre PUD. Learned what a pro forma does to a drawing.
Originating the work rather than waiting for it- across DFW, Houston and Austin. Built the pipeline, the reporting, and the relationships behind them.

101 units under Affordability Unlocked. During bidding the developer moved the building from wood to cold-formed steel- after permit. I revised the specifications, details and drawings in two weeks.
Design · Permitting · CA
Four townhouses at 2,300 square feet each, on a narrow lot.
Design · Permitting · Built
White volumes stepped down a hillside above the Colorado River, with the living floor cantilevered over the pool.
Design · Permitting · Built
76 prefabricated units for people 55 and up, on six and a half acres across from Buda City Hall. Council approved it in January 2021. I carried it from entitlements through building permits, and the old house on the site stayed- it became the Great House.
Entitlements · Design · Permitting
386 affordable units across three buildings on the Nashua River. New Hampshire Housing backed it with $32 million in bonds, which fixes forty percent of the units at 60% AMI.
Design · Permitting
A historic landmark. Tim Cuppett led the design and I assisted. I took it through the Historic Landmark Commission for an addition and a porte cochere, then ran construction administration in the house.
Assisted · Permitting · CA
A hundred acres rezoned to CD-4 and CD-5, with CD-5 pushed for density. Roughly 1,280 units, retail, a hotel and a sports complex, and 11.7 acres of parkland against a 5.7 acre requirement.
Entitlements · Concept · Permitting
A wellness campus of prefabricated buildings across rolling hill country. The hard part was a water moratorium.
Design