cost vs rent check
type the lot, the cost and the rent. the page draws the massing those numbers imply and compares the yield on that cost with the hurdle you set. change anything; the drawing and the result follow.
inputs
what the massing does not check. the 55% lot coverage default is the maximum building coverage of MF-3 (25-2-492). MF-3 also limits floor-area ratio and density (25-2-562 sets site area per unit), and this page checks neither, nor height or impervious cover. at the default three stories the building drawn here is well past MF-3's floor-area and density limits, so a massing this large may not be permittable at that coverage. treat the unit count as what the lot geometry and your inputs produce, not as what the zoning allows.
the answer
what the numbers draw
site plan
lot, setbacks, and the footprint that is left
section
stories stacked, net rentable against gross
the arithmetic
| line | value | how |
|---|
how fragile is it
yield on cost when rent and hard cost each move ten percent. the middle cell is the base case.
| rent \ hard cost | hard cost -10% | base | hard cost +10% |
|---|
checks - the assumptions behind the answer
read this before using any of it
the question is always the same. someone owns a lot, or is about to, and wants to know what it can hold and what it might cost against what it might rent for. that answer needs a drawing and a number. they usually come from two firms, on two timelines, for two fees, and by the time both arrive the deal has moved.
the zoning reading is the product. not the drawing on its own and not the estimate on its own, but knowing which rules govern the lot and drawing what they allow, with no firm to spin up. a designer who can read the zoning and draw the answer, working with a cost estimator who can price it, is the whole service.
this page is the front door, not the answer. it shows the shape of the argument in thirty seconds. the real answer needs the real lot, the real zoning, a real cost quote, and a drawing that has been looked at by someone who has built one. if the defaults here made you curious, that is what the page is for.