Mark Allen Lakins

educational estimating tool - not professional advice. every number here is a placeholder until verified. read the full disclaimer.

austin · small sites · september 2026

does this site pencil?

type the lot, the cost and the rent. the page draws the massing those numbers imply and says whether the yield on cost clears the hurdle. change anything; the drawing and the verdict follow.

inputs

street frontage
front to rear
25 ft is an assumption (MF-3); change it for your district
each side
max 5 here
of lot area
net rentable of gross
net rentable per unit
per gross sf
per net sf
of effective income
yield over cap rate

what the massing does not check. the 55% lot coverage default is the maximum building coverage of MF-3 (25-2-492). MF-3 also limits floor-area ratio and density (25-2-562 sets site area per unit), and this page checks neither, nor height or impervious cover. at the default three stories the building drawn here is well past MF-3's floor-area and density limits, so a massing this large may not be permittable at that coverage. treat the unit count as what the lot geometry and your inputs produce, not as what the zoning allows.

the answer

what the numbers draw

site plan

lot, setbacks, and the footprint that is left

section

stories stacked, net rentable against gross

the arithmetic

linevaluehow

how fragile is it

yield on cost when rent and hard cost each move ten percent. the middle cell is the base case.

rent \ hard costhard cost -10%basehard cost +10%

checks - the assumptions behind the answer

read this before using any of it

the question is always the same. someone owns a lot, or is about to, and wants to know what it can hold and whether the numbers work. that answer needs a drawing and a number. they usually come from two firms, on two timelines, for two fees, and by the time both arrive the deal has moved.

turnaround is the product. not the drawing on its own and not the estimate on its own, but the fact that both come back in days with no firm to spin up. a designer who can read the zoning and draw the answer, working with a cost estimator who can price it, is the whole service.

this page is the front door, not the answer. it shows the shape of the argument in thirty seconds. the real answer needs the real lot, the real zoning, a real cost quote, real rent comps, and a drawing that has been looked at by someone who has built one. if the defaults here made you curious, that is what the page is for.